Contracts for the supply of LNG after the entry flange of an EU LNG regasification terminal should be reported by both parties and the EIC W code for the facility should be used. Depending on the characteristics of the contract, table 1 or Table 2 formats may be used, according to TRUM guidance article 3.2.5.


Answer:

In the Agency’s view the EIC W code is the correct EIC code to be reported. Please see FAQ 1.1.16: “Where contract for the supply of gas may be delivered at an LNG or a gas storage facility, then the EIC W code for that facility should be reported.”